feat/carloku-consent-terms-20261003
No description yet.
Commits
100
Files changed
682
+218054 −486
Discussions
0
0 open
Tasks
0/0
done
Discussions
- No discussions on this branch yet.
Tasks
- No tasks yet.
Activity
- claude agent, operated by paul@keymail.dev pushed fc99f7fb6 Hold mixed-version invoice months for review and bound legacy catalogs
- claude agent, operated by paul@keymail.dev pushed d504567a1 Pin historical partial invoice fixture to its original terms
- claude agent, operated by paul@keymail.dev pushed 7b14d6a5d Reuse reviewed CLI and socket fixture isolation for allowance gate
- claude agent, operated by paul@keymail.dev pushed 5b1d7c02f Version approved pooled awake allowances and preserve historical terms
- claude agent, operated by paul@keymail.dev pushed ef41648af Readiness and handoff: the design branch's tenth code review answered (3678b940) and Part C's fifth slice, the gate and the fleet, landed after it (358b25ee); eleventh review and a gate running; the gate on f11464ec passed
- claude agent, operated by paul@keymail.dev pushed e90bfc7c5 Readiness and handoff: the design branch's ninth code review answered (a579d845) and Part C's fourth slice landed after it (f11464ec), tenth review and a gate running; the gate on c824ed81 failed on an unrelated activator test (amadan #206)
- claude agent, operated by paul@keymail.dev pushed 5a7ff0f82 Readiness and handoff: the design branch's eighth code review answered with Part C's second and third ledger slices (c824ed81, design revision 14), ninth review and a gate running; the gate on 47efe06f passed
- claude agent, operated by paul@keymail.dev pushed 3aede1a61 Readiness and handoff: the design branch's seventh code review answered with Part C's first ledger slice (47efe06f), eighth review and a gate running; the gate on Task 3's tip passed
- claude agent, operated by paul@keymail.dev pushed 620b66482 Readiness and handoff: the gate on the design branch's third slice passed; required coverage (plan Task 3) landed at f0ed32b7, its gate running; the seventh review running
- claude agent, operated by paul@keymail.dev pushed 7e233df7b Readiness and handoff: the design branch's sixth code review answered with the inventory's third slice (28e7f4d6), seventh review and a gate running
- claude agent, operated by paul@keymail.dev pushed d43f9a22c Readiness and handoff: the gate on the design branch's second slice (cc1500a9) passed; the third slice (retained chains rechecked at every look) built in a tree copy, awaiting the sixth review
- claude agent, operated by paul@keymail.dev pushed 3e77f818a Readiness and handoff: the design branch's fifth code review answered with the inventory's second slice (cc1500a9), sixth review and a gate running; the first slice's gate passed
- claude agent, operated by paul@keymail.dev pushed 26e571a68 Readiness and handoff: the design branch's fourth code review answered with design revision 11 and the inventory's first slice on retained descriptors (ccfd331a), fifth review running
- claude agent, operated by paul@keymail.dev pushed b86cb81bc Readiness and handoff: the design branch's third code review answered at 7ba5fc72 with design revision 10, fourth review running; the step-1 task plan on the branch
- claude agent, operated by paul@keymail.dev pushed 10faaac25 Readiness and handoff: the design branch's second code review answered at 0a527924 with design revision 9 (the lower bound), third review running
- claude agent, operated by paul@keymail.dev pushed 236de5847 Readiness and handoff: the design branch's first code review answered at 50a6f056, second review running
- claude agent, operated by paul@keymail.dev pushed 5ef59a359 Handoff: a clock stamp corrected (the acceptance was about 08:05, not 08:35)
- claude agent, operated by paul@keymail.dev pushed ba930b3be Readiness and handoff: plan step 0's admission model and step 1's authority package built on the design branch (5bfcc7ba), under their first code reviews
- claude agent, operated by paul@keymail.dev pushed 6d37944cc Readiness and handoff at 08:35: the replicator's authority design accepted (review 8 confirmed revision 8 with no finding); plan step 0's admission model under test on the design branch
- claude agent, operated by paul@keymail.dev pushed 76befb280 Readiness and handoff at 08:05: the replicator's authority design accepted with fixes at its seventh review; revision 8 applies them under a confirming eighth review
- claude agent, operated by paul@keymail.dev pushed ad8ea7472 Readiness and handoff: the clock times for the seventh review corrected (started 07:51, not 08:03)
- claude agent, operated by paul@keymail.dev pushed c50da9e4d Readiness and handoff at 08:05: the replicator's authority design at revision 7 under its seventh review
- claude agent, operated by paul@keymail.dev pushed 82707e426 Readiness and handoff at 07:45: the replicator's authority design at revision 6 under its sixth review
- claude agent, operated by paul@keymail.dev pushed 8ae996758 Readiness and handoff at 07:25: the replicator's authority design at revision 5 under its fifth review
- claude agent, operated by paul@keymail.dev pushed b91db67e0 Readiness and handoff at 07:10: the replicator's authority design at revision 4 under its fourth review
- claude agent, operated by paul@keymail.dev pushed 2736b8bf6 Readiness and handoff at 06:55: the replicator's authority design at revision 3 under its third review
- claude agent, operated by paul@keymail.dev pushed 2f524f089 Readiness and handoff at 06:40: the replicator's authority design at revision 2 under its second review
- claude agent, operated by paul@keymail.dev pushed 523363326 Readiness, handoff and outstanding at 06:28: the replicator's authority design written and under review
- claude agent, operated by paul@keymail.dev pushed b71e6dd51 Readiness, handoff and outstanding at 06:22: the launch tip 8777d28e passed its gate and CI; the replicator's next design scoped
- claude agent, operated by paul@keymail.dev pushed 8777d28e4 Task 5 and the records at 06:10: per-line tax codes merged; the ENABLEMENT activation rule keyed to freeze and the every-month tightening; OUTSTANDING item 17 built but inactive; readiness and handoff