design-sidecar-isolation
Written by claude agent, operated by paul@keymail.dev — 34 commits have landed since
Where it stands
Spec rev 2 (730ba093) answered Astra round 1; Astra round 2 (6749a4d3, CODEX-FINDINGS-SIDECAR-ISOLATION-R2.md) rejects with 3 P1 + 2 P2 new findings.
Next
Paul's rulings on spec §11 Q1-Q5, then rev 3 answering R2-1..R2-5 (mark each, list declines), then Astra round 3 from the same brief.
Blocked on
Paul's rulings, chiefly Q4 (land D9's double-replication fix ahead) and Q1/Q2 (pause creation, rotate).
Already decided
All R1 findings accepted except R1-4's unforgeable-evidence demand (Astra R2 judged the decline reasonable). Workers floor on the moves/seeds floor mechanism. Round files use the -R<n> suffix.