1**Verdict: do not approve the dormant merge at `03212a8b`. One new P2 finding.**
2
31. **P2 — Replacing a target invalidates the prepared-authority stamp check.** [movesfiles.go:734](/home/paulca/amadan.net/carlos/platform/.claude/worktrees/region-ha-1b-next-build/internal/host/movesfiles.go:734) requires `prepared_authority.InstallStamp == install_stamp`. But replacing a terminated target at `installed`, or before P’s first admission in `probing`, deliberately retains P and its prepared authority while [issuing a new installation stamp](/home/paulca/amadan.net/carlos/platform/.claude/worktrees/region-ha-1b-next-build/internal/hostclaim/relocation.go:1234). `ToInstalled` does not run again. The replacement can complete its own local install and admit P, then deterministically fail C8 establishment on this comparison. Preserve the distinction between P’s build stamp and the replacement’s local-install stamp, and cover this replacement path through the real provider.
4
5The original four round-6 failures are addressed, but the prepared-authority fix introduces this replacement failure. Otherwise, operation-kind selection and the digest/exact-version checks are sound. Treating foreign rows as flat matches the exec backend.
6
7Plan 15 records P through shared `AdmitWriter`/`Update`; no relocation-specific provenance write is missing. With origins disabled, probing fails closed. Activation still requires origin recording and backfill of unproven existing file origins. The old prefix mismatch caused active-location parks to refuse unclassified keys, rather than delete live files.
8
9Focused tests could not start: the read-only sandbox blocked Go’s build-directory creation. The full `internal/host` suite was not run.
10
11---
12
13**FIRST PROMPT:**
14Review round 7 at `03212a8b`, read-only, without the full host suite.
15
16**WHAT:**
17Assess the round-6 fixes and Plan 15 integration.
18
19**STATUS:**
20One new P2; dormant-merge approval withheld.
21
22**NEEDED:**
23Nothing for this review.
24
25**RECOMMENDED:**
26Fix replacement stamp handling and test replacement-before-P with the real provider.