Reviewed 996b24c3. P refers to the implementation plan. Stage B dispositions assess contracts only.

| Finding or partial carried by round 4 | Disposition | Assessment against rev 5 | |---|---|---| | R1-5 — immutable files pin | Resolved | P8271 preserves verification against the retained manifest. | | R1-9 — release replay after restart | Resolved | P8269 requires Region initially and on recovery, plus Recover and a coordinator replay test. | | R2-N4 — completed target remains held | Resolved | The policy permits clearing with HA enabled; P8274 retains the adapter’s completion test. | | R2-N5 — retained controller lifetime | Resolved for the timeout | The entry survives an interrupted close. Cleanup safety remains incomplete below. | | R3-N1 — adapter identifiers and fixture | Resolved at contract level | P8274 requires the real adapter and its integration tests; compilation awaits Stage B. | | R3-N2 — premature controller removal | Resolved | P7616–7620 retains the entry when close or clear fails. | | R3-N3 — production provider wiring | Resolved | R8 requires the verified actor before policy capture; P8275 names the assembly test. | | R3-N4 — fenced source’s hold | Resolved | Task 9a provides the hold-only path with a fresh decision under WithLocal. | | R3-N5 — exhausted target after installation | Resolved | FenceExhaustedTarget consumes the fence and reaches stuck pinning. | | R3-N6 — replacement acknowledgement | Resolved | PinAfterRelease checks acknowledgements before leaving releasing. | | R4-1 — fence observer deadlock | Resolved | P3568 reads without reacquiring the lock; Task 9a tests both paths with the real observer. | | R4-2 — target probe authority | Resolved | Task 3 admits the separate "probe" action; R1 requires runtime dispatch through it. | | R4-3 — missing restore directories | Resolved at contract level | P9014–9017 requires inventory and directory creation before restore, tested on a fresh spare. | | R4-4 — privileged held staging | Resolved at contract level | R9 and P9019–9022 require relocation-aware root staging and verification. | | R4-5 — durable controller cleanup | Partly; P1 safety gap | P7616–7619 relies on a successful Close before clearing. But Controller.Close returns a cleanup failure once, sets closed, then returns nil on subsequent calls. The next sweep can therefore clear the record despite failed cleanup. Restart recovery at P7640 likewise clears from the binding without cleanup-success evidence. Persist that evidence or repeat authenticated cleanup before clearing; test failure followed by another sweep and restart. Also discover records left by a crash before the first Finish. Carry these obligations into P8270. | | R4-6 — obsolete-hold clearance with HA disabled | Resolved | The bypass now requires Policy.Relocation; both settings are tested. |

New findings, ranked:

  1. P1 — Task 1, Step 3; Task 2, Step 3; Task 5, Step 3: replacement can install on a box owing park-local. P2780–2786 excludes lost boxes but not boxes with outstanding local retirement. The worker’s exclusions at P5595–5605 omit those obligations too. During replacement, P2071–2073 calls install directly, bypassing ToInstalling’s park-local check.

Start A→B while spare C owes an older local retirement, then terminate B during installing or installed. C can receive new installation authority despite that obligation. Spec §2 explicitly excludes C.

Fix: exclude these boxes during selection and enforce the condition again inside the replacement CAS. Test refusal of C and selection of a clean spare.

  1. P2 — Task 1, Step 3: automatic fencing leaves regional chores assigned to the dead box. fenceBox at P1369–1411 handles local discharge and loss retention but never reassigns park-generation or park-replica obligations. A box-owned park-generation is permitted by RelocationStartGuard, so failover can leave it permanently assigned to the terminated source.

L3 requires reassignment to region:<r>; lost.go:302 already implements this for declared loss.

Fix: apply equivalent reassignment in the automatic fence CAS, preserving obligation identities and scope. Test with both qualified and unqualified local discharge.

  1. P2 — Task 9a, Step 3: reconciliation changes behavior with HA disabled. P8163–8187 unconditionally replaces Serving with RelocationRow, accepting RowHeld even when both new callbacks are nil. A moving or restoring executor participant now passes the initial check. Dry runs succeed; real calls can activate the installation and record inventory before the later write-policy refusal. WorkSource.SelectAt does not evaluate that policy.

Fix: preserve the original serving-only check when HA is disabled. Test non-serving executor claims with HA off, asserting refusal and unchanged guard/inventory state.

  1. P2 — Task 7, Step 4: an interrupted journal write hides all restart cleanup work. P7658–7672 writes .json.tmp before renaming. A crash can leave it truncated. journaled attempts to decode every directory entry at P7544–7551, so that temporary file makes the whole listing fail. Retained discards the error at P7570.

After restart, even valid finishing entries for other hosts disappear from the sweep, leaving their controller records blocking updates indefinitely.

Fix: exclude uncommitted temporary files, surface committed-record errors, and preserve unrelated recoverable entries. Test a restart with one valid journal and one truncated temporary file.

  1. P2 — Task 7, Step 4: release flushing preserves a deleted environment file. P7199 loads the existing manifest. When the environment file is absent, P7210–7218 does nothing, leaving the old Platform[EnvItem] intact. Flushing KEY=v, removing the file, and flushing again therefore still publishes KEY=v for restoration. This contradicts the final-state promise and §5.6’s requirement to flush deletions.

Fix: represent platform-item deletion explicitly and stage it on ENOENT. Extend the flush test with a previously published environment file that is subsequently removed.

I accept rulings 1–24 as scoped choices; ruling 20 remains incompletely implemented. Stage B covers the earlier integration obligations, but its cleanup contract needs the recovery requirements identified under R4-5.

All 12 embedded patches pass git apply --check. Compilation and tests were not reproduced in this read-only sandbox. No files changed.

Verdict: not ready.