Reviewed d93c94d0. P below refers to the implementation plan. 6b refers to the declared plan on origin/design-replica-ownership.

All 11 embedded patches pass git apply --check. Compilation and tests were not reproduced in this read-only sandbox.

| Prior finding | Disposition | Assessment against rev 3 | |---|---|---| | R1-2 — build authority | Resolved | Each builder write now checks claim and installation identity; lease loss cancels the build. | | R1-4 — former writer’s loss evidence | Resolved | Retained evidence includes the former writer’s last admission and its consequences. | | R1-5 — immutable files pin | Partly | Copying uses retained bytes, but PreparedFromInstallManifest.Verify still reads the mutable source manifest at P:7825–7834. A late PUT still prevents progress. Verify against the retained control-bucket copy too. | | R1-9 — release replay after restart | Partly | P:7103 restores the old controller identity without setting Recover. 6b’s stop coordinator rejects that identity mismatch before replay (6b:11975–11976). Use its authenticated recovery path and preserve the recorded owner’s directory revision. | | R1-13 — later empty probe | Resolved | Later attempts handle genselect.ErrEmpty and use ordinary empty-generation authority. | | R1-14 — row-case adapter test | Resolved | The incorrect deletion/status expectations are corrected. The replacement test has a separate compilation defect below. | | R1-16 — exhaustion before selection | Resolved | Both paths check exhaustion before choosing a spare. A different exhaustion boundary fails below. | | R2-N1 — prepared retry ordering | Resolved | Inherited flags are reset; ordinary retries leave Prepared false. | | R2-N2 — forbidden deletion expectation | Resolved | Existing unexplained rows are retained; assertions use hold_op. | | R2-N3 — descriptor privileges | Resolved as a gated contract | Agent capture is process-local; R3 explicitly requires root’s complete scan. | | R2-N4 — completed target remains held | Not resolved | The clear at P:8537–8542 is inside the write callback. Before reaching it, serving Policy.Check rejects any nonempty hold (wakepolicy.go:63). Provide narrowly scoped authority to clear an obsolete hold before that rejection. | | R2-N5 — retained controller lifetime | Partly | Sweeping is added, but a timed-out close loses the reference needed to finish cleanup; see new finding 2. | | R2-N6 — three-attempt limit | Resolved | The claim durably counts attempts before invoking R1’s single-attempt probe contract. | | R2-N7 — discovery completion | Resolved | Qualified discharge now uses CompleteObligation semantics. |

New findings, ranked:

  1. P1 — Task 9, Steps 1 and 4: identifiers are missing from the declared upstream. P:8529 uses observed.Claim at the insertion after write(owner). In 6b, observed is declared only inside the earlier sql.ErrNoRows block (6b:7891–7902), so it is undefined at that insertion. P:8373 also calls adapterFixture, attributed to a 6b fixture that the declared plan does not supply. Fix: read and validate the claim under captured authority at the insertion point, and include the actual test fixture and its methods.
  1. P2 — Task 7, Step 4: Finish forgets a controller before closing it successfully. P:6933–6942 removes the map entry before calling Close(ctx). Main explicitly retains the lifetime lock when closing times out and requires another Close call (controller.go:478). If the pass expires during cleanup, later sweeps cannot find that controller; another relocation cannot acquire the host’s lock. Fix: retain the entry until closing completes, then conditionally remove that same controller. Test cancellation followed by a successful later sweep and another relocation.
  1. P2 — Tasks 3/9/10: production construction never supplies the new policy and fence observer. Policy.Relocation is mandatory for relocation actions (P:3221–3238), but its assignments are confined to tests. 6b constructs the policy with only Inputs, Moves and Held (6b:10887), then captures a.Policy.Check (6b:10520). Task 10 supplies neither the relocation policy nor Reconciler.FenceClosed, whose default is false (P:8499). Executor reconciliation and execution therefore remain refused, and source-fence closure is invisible to row decisions. Fix: define and wire both providers before assembly construction captures the policy, gated on the feature flags. Test production assembly with HA enabled and disabled.
  1. P2 — Task 9, Step 3: a fenced source cannot write its required hold while it remains executor. P:8485 chooses holdOnly only when op.exec != box. During releasing, the source remains executor after its admission fence closes. It therefore takes the guarded installation path, where the active fence or receipt prevents the callback (guard.go:144). This contradicts the WithLocal behavior promised by P:8363. Fix: use the conditional hold-only path for a source whose admission fence is closed, even while it remains executor. Test with a real durable fence.
  1. P2 — Tasks 1/5, Step 3: exhaustion cannot stop a terminated target after local installation. After two replacements, let the final target journal local_install in installed, then terminate before probing. P:5197–5198 calls MarkStuck, but P:1968–1969 refuses precisely that state. Every pass repeats the refusal; the dead target cannot probe, and its fence is never consumed. Fix: define a fence-consuming terminal transition that retains loss evidence, revokes the dead installation’s authority and reaches a safe stuck state without selecting a third replacement. Extend the exhaustion test beyond starting.
  1. P2 — Task 1, Step 3 / Task 5, Step 3: replacement acknowledgement is skipped when leaving releasing. If the target terminates after the source journals its release, replacement adds a new participant while retaining releasing (P:1891–1892, 1935–1936). The next worker pass calls PinAfterRelease, which advances to pinning without checking acknowledgements (P:1543–1556). Spec §5.8 requires the replacement to acknowledge before leaving that phase. Fix: require the acknowledgement barrier in the releasing → pinning CAS. Test a replacement with its acknowledgement withheld after source release publication.

I accept the author’s remaining rulings as scoped choices. Rulings 5/21, 9, 17 and 20 remain incompletely implemented for the reasons above. R3’s privilege split and R5’s retained consequences address the earlier requests; the missing production policy wiring needs an explicit implementation or upstream request.

No files changed. Verdict: not ready.