| 1: Missing receipt after P opens does not cause `stuck` | Resolved | `VerifyReceipt` compares the durable receipt exactly; the participant marks a missing or changed receipt `stuck` before another admission. Tests cover receipt loss, restart and preservation of post-admission changes. Stage B assigns the production provider and tests. |
6
| 2: Restart repairs cleanup faults in the lifecycle property | Resolved | The crash event preserves faults and durable records, prevents dead-generation cleanup from completing, and separates recovery. Invariant (h) checks record retention and executable-update denial. |
7
8
**No new findings.** I accept rulings 1–24. Stage B contracts retain the prior obligations, owners and named tests.
9
10
All 12 embedded patches pass `git apply --check`; all 43 complete Go blocks parse with `gofmt`. Compilation, runtime tests and mutation results were not independently reproduced in this read-only session.
11
12
---
13
14
**FIRST PROMPT:**
15
“Follow the review brief docs/superpowers/plans/CODEX-PLAN-REGION-HA-1BN-BRIEF-16.md. Review the plan at commit 40da09b2.”
16
17
**WHAT:**
18
Review Stage A readiness and Stage B contracts.
19
20
**STATUS:**
21
Both round 15 findings resolved; no new findings.
22
23
**NEEDED:**
24
Nothing.
25
26
**RECOMMENDED:**
27
Build Stage A; retain Stage B’s re-plan and review gate.
28
29
**SESSION:**
30
Safe to close — no files changed or processes left running.
31
32
**Verdict: stage A ready to build, with stage B contracts complete.**