| 1 | Reviewed `56572359`. |
| 2 | |
| 3 | | Round 11 finding | Disposition | Assessment against rev 12 | |
| 4 | |---|---|---| |
| 5 | | Admission trimming loses valid file origins | Resolved | Referenced origins now survive independently of admissions. The regression exercises ten real admission/publication cycles and successfully copies the retained `g1` file. | |
| 6 | |
| 7 | 1. **P2 — Task 7: acknowledging a successor before sweeping its predecessor can deadlock.** |
| 8 | |
| 9 | [`Acknowledge`, lines 8998–9011](/home/paulca/amadan.net/carlos/platform/.claude/worktrees/region-ha-1b-next/docs/superpowers/plans/2026-10-07-region-ha-1b-next-relocation.md:8998) looks up controllers by host **and operation**, then opens a missing controller using `e.Lifetime`. |
| 10 | |
| 11 | If relocation A completes and B starts before this box sweeps A, A still holds the host’s lifetime lock. B’s `hostexec.Open` waits for that lock; its pass deadline cannot interrupt the agent-lifetime context. The sequential participant pass cannot reach the sweep that would release A. |
| 12 | |
| 13 | **Fix:** retire obsolete controllers for the same host before opening a successor, with bounded acquisition. Handle `ClearStale`’s refusal when the successor still lists this box ([controller.go:643](/home/paulca/amadan.net/carlos/platform/.claude/worktrees/region-ha-1b-next/internal/hostexec/controller.go:643)). Add a real-controller regression where B starts before A’s sweep. This is an additional interleaving in the cleanup added after round 2. |
| 14 | |
| 15 | 2. **P2 — Task 8c, Step 4 / Stage B contracts: successful probes require an unassigned launch dependency.** |
| 16 | |
| 17 | [R1](/home/paulca/amadan.net/carlos/platform/.claude/worktrees/region-ha-1b-next/docs/superpowers/plans/2026-10-07-region-ha-1b-next-relocation.md:204) requests probe dispatch; [Task 8c’s gate](/home/paulca/amadan.net/carlos/platform/.claude/worktrees/region-ha-1b-next/docs/superpowers/plans/2026-10-07-region-ha-1b-next-relocation.md:10348) requires 6b and that dispatch. |
| 18 | |
| 19 | However, upstream claim Plan 6b explicitly supports no enabled tenant launch. Its `Roles.Preflight` refuses before probe dispatch (6b:12587–12590, 14392). Its external-completion gate requires a reservation-bearing isolated root-launch protocol and states that external owner adapters do not supply it (6b:15881). Completing R1 as specified still leaves every production probe refused. |
| 20 | |
| 21 | **Fix:** assign that integration through an explicit upstream request and Stage B activation gate. Add a named production probe test covering successful isolated launch and refusal without the protocol. |
| 22 | |
| 23 | I accept rulings 1–24. All 12 embedded patches pass `git apply --check`; all 41 complete Go blocks parse with `gofmt`. Compilation and tests were not reproduced in this read-only session. |
| 24 | |
| 25 | --- |
| 26 | |
| 27 | **FIRST PROMPT:** |
| 28 | “Follow the review brief docs/superpowers/plans/CODEX-PLAN-REGION-HA-1BN-BRIEF-12.md. Review the plan at commit 56572359.” |
| 29 | |
| 30 | **WHAT:** |
| 31 | Review Stage A readiness and Stage B contracts. |
| 32 | |
| 33 | **STATUS:** |
| 34 | Round 11 resolved; two P2 findings. |
| 35 | |
| 36 | **NEEDED:** |
| 37 | Nothing. |
| 38 | |
| 39 | **RECOMMENDED:** |
| 40 | Fix successor controller handover and explicitly gate the production launcher. |
| 41 | |
| 42 | **SESSION:** |
| 43 | Safe to close — no files changed or processes left running. |
| 44 | |
| 45 | **Verdict: not ready.** |