Astra stage B round 3 brief
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
1 file changed,
+21
−0
docs/superpowers/plans/CODEX-PLAN-REGION-HA-STAGE-B-BRIEF-3.md+21 −0
CI failed — run details
diff --git a/docs/superpowers/plans/CODEX-PLAN-REGION-HA-STAGE-B-BRIEF-3.md b/docs/superpowers/plans/CODEX-PLAN-REGION-HA-STAGE-B-BRIEF-3.md| new file mode 100644 |
| index 000000000..c57b9959d |
| --- /dev/null |
| +++ b/docs/superpowers/plans/CODEX-PLAN-REGION-HA-STAGE-B-BRIEF-3.md |
| @@ -0,0 +1,21 @@ |
| +# Astra round 3 brief: region HA stage B plan rev 3 |
| + |
| +**Review:** `docs/superpowers/plans/2026-10-10-region-ha-1b-next-stage-b.md` rev 3 (b897dbb7). The "Rev 3: round 2 dispositions" table answers your round 2 (`CODEX-PLAN-REGION-HA-STAGE-B-R2.md`): 9 accepted, 2 changed. Briefs 1 and 2 still apply. |
| + |
| +**What changed:** |
| +- **C7 is withdrawn.** Completion journals the probe stop's receipt reference on the serving op. The first serving wake verifies it and hands it to `ColdHandover.Run` as the exact prior, which is your round 2 suggestion; named change N6. |
| +- **New claim ask C10**, an activation gate: a CC9 discharge of the participation by the completed probe evidence. |
| +- **New claim ask C11:** root pins `install_stamp` only for P's opening. Until it lands, the fallback is one launchable attempt per target. |
| +- **O2 → O2'.** There is a three-source key-evidence check: `instance.key`; the platform key plus an adoption record; or the config key. It is defined in the instance-key plan, which is still being revised on branch `instance-key-build`. |
| +- **The 200-seed lifecycle scenarios** are ported to `productionClaimLocal`. |
| + |
| +**Judge:** |
| +1. Is each round 2 finding closed? |
| +2. Is N6 sound against `ColdHandover.Run` and root's receipt verification? Can the serving wake accept a receipt that doesn't belong to this host's last writer? |
| +3. Is C10's discharge rule safe? Above all: can a lease loss during the probe leave a participation discharged while work is still running? |
| +4. Is C11's fallback safe and bounded? |
| +5. Is the O2' check correct, and does the negative case refuse? Is the pinner interface stable enough, given the adoption record's shape isn't final? |
| +6. Are the ported lifecycle scenarios real coverage? |
| +7. Anything new? |
| + |
| +Give findings P1/P2/P3 with file:line, then a verdict: ready to build, or not. |