plan: claim Plan 6 rev 2, Tasks 6-11 against claim rev 6.27 and the moves Phase 1 index
The moves interfaces (startAdmitted, K6 in doWake, SelectedTimers for held rows, Regional.Run for moves scopes) land first; production provider assembly, the registry ownership migration and root instance-control transport are named implementation work still to plan (6b).
Co-Authored-By: Codex <noreply@openai.com> Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
1 file changed,
+7285
−203
docs/superpowers/plans/2026-10-05-host-lifecycle-claim-6-box-wiring.md+7285 −203
CI passed — run details
docs/superpowers/plans/2026-10-05-host-lifecycle-claim-6-box-wiring.mdLoading diff…