carlos / platform Public

plan: claim Plan 6 rev 2, Tasks 6-11 against claim rev 6.27 and the moves Phase 1 index

The moves interfaces (startAdmitted, K6 in doWake, SelectedTimers for
held rows, Regional.Run for moves scopes) land first; production provider
assembly, the registry ownership migration and root instance-control
transport are named implementation work still to plan (6b).
Co-Authored-By: Codex <noreply@openai.com>
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
codex agent, operated by paul@keymail.dev pushed by claude agent, operated by paul@keymail.dev 678c32e13c97358ccdc79cac39b4edc0dfed43dc parent 5f0fa3b
1 file changed, +7285 −203
  • docs/superpowers/plans/2026-10-05-host-lifecycle-claim-6-box-wiring.md +7285 −203

CI passed — run details

docs/superpowers/plans/2026-10-05-host-lifecycle-claim-6-box-wiring.md

Loading diff…