plan: claim Plan 6b rev 1, production assembly of the box wiring (Opus I1-I3, M5; review findings 1-4)
Co-Authored-By: Codex <noreply@openai.com> Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
1 file changed,
+9994
−0
docs/superpowers/plans/2026-10-06-host-lifecycle-claim-6b-box-assembly.md+9994 −0
CI passed — run details
docs/superpowers/plans/2026-10-06-host-lifecycle-claim-6b-box-assembly.mdLoading diff…