Astra confirming brief: stage B final fix wave
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
1 file changed,
+17
−0
docs/superpowers/plans/CODEX-REVIEW-REGION-HA-STAGE-B-BUILD-BRIEF-2.md+17 −0
CI cancelled — superseded by a newer push — run details
CI log
=== gate === cd launchctx && go vet ./... && go test ./... -count=1 ok amadan.net/carlos/platform.git/launchctx 0.012s ? amadan.net/carlos/platform.git/launchctx/controlname [no test files] ? amadan.net/carlos/platform.git/launchctx/wireid [no test files] go vet ./... gofmt -l .: clean go test ./... -count=1 -timeout 30m amadan: job cancelled — a newer push superseded it
diff --git a/docs/superpowers/plans/CODEX-REVIEW-REGION-HA-STAGE-B-BUILD-BRIEF-2.md b/docs/superpowers/plans/CODEX-REVIEW-REGION-HA-STAGE-B-BUILD-BRIEF-2.md| new file mode 100644 |
| index 000000000..8a3edb765 |
| --- /dev/null |
| +++ b/docs/superpowers/plans/CODEX-REVIEW-REGION-HA-STAGE-B-BUILD-BRIEF-2.md |
| @@ -0,0 +1,17 @@ |
| +# Astra: confirming review of the stage B final fix wave |
| + |
| +Your stage B build review (`CODEX-REVIEW-REGION-HA-STAGE-B-BUILD.md`) found three P2s. Fable's final review confirmed them and added I4: the record-write census gate failed. The fix wave is 99a00923..c9b51c47: |
| + |
| +- **A1.** `hostfiles.Present` and `Restore` now share one rule, `superseded`, for overlapping file and directory entries, so restored overlaps verify. |
| +- **A2.** A passed probe is recovered through `Effects.PassedProbe`, from `attempts.json`'s healthy state. It is keyed to the holder's session, generation, stamp, record attempt and executor, and it runs before Preflight. No new launch. |
| +- **A3.** A repair across a config change replaces the receipt with one CAS before admission (`hostclaim.ReplaceLocalInstall`). It refuses after P is admitted, refuses another box, enrollment or stamp, and refuses any receipt other than the one the repair started from. `EnsureLocal`, `VerifyReceipt` and `relocationAfterAdmission` all compare one digest. |
| +- **I4.** Eight census sites were reviewed and classified, and the gate passes. |
| + |
| +Fable's re-review judged the branch ready to merge, dormant behind its gates. |
| + |
| +**Judge:** |
| +1. Are your three findings closed? |
| +2. Did the fixes introduce anything new? |
| +3. Is the branch ready to merge, dormant behind its gates? The gates are Task 11 after J2, a re-merge of main with the census reconciled, CI, and Paul's decision. |
| + |
| +Give findings as P1/P2/P3 with file:line, then a verdict. |