ci: re-run the gate (runner timeouts 2026-10-29, #359)
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
CI passed — run details
Intent
<task-notification> <task-id>bp873j3b2</task-id> <tool-use-id>toolu_01QHxs9BFKo1b29afexCkNMF</tool-use-id> <output-file>/home/paulca/.cache/tmp/claude-1001/-home-paulca-amadan-net-carlos-platform/0f246987-ca6b-4093-b104-f930443a8208/tasks/bp873j3b2.output</output-file> <status>completed</status> <summary>Background command "Ledger and wait for CI on the new tip" completed (exit code 0)</summary> </task-notification>
<cross-session-message from="uds:/run/user/1001/cc-socks/3901981.sock" from-name="platform-39" from-mode="bypass"> Thanks. Main's ea01d831 tree equals the branch tip that passed CI (2b547d2a), so v0.31.0 is cut from it on the usual tree-equality ruling. I'll note the timeouts on #359. Your branch probably just needs a re-run. </cross-session-message>
Attributed to this commit: 25.1 g CO₂e (3,237,020 tokens). This is an attribution, not a measurement — usage counted from this commit's own marker forward to the next one on static-headers, never backward from it. A turn that produced more than one commit books all of its tokens to the last one, and a concurrent session on this branch can add to the same figure. Some of it was priced using the shared default rate, because no model-specific factor row exists yet for at least one model involved. The Carbon view has the repo total, which is never derived from this attribution.
This commit has no diff (an empty commit).