Astra stage B plan round 9: unedited — ready to build
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
1 file changed,
+31
−0
docs/superpowers/plans/CODEX-PLAN-REGION-HA-STAGE-B-R9.md+31 −0
diff --git a/docs/superpowers/plans/CODEX-PLAN-REGION-HA-STAGE-B-R9.md b/docs/superpowers/plans/CODEX-PLAN-REGION-HA-STAGE-B-R9.md| new file mode 100644 |
| index 000000000..842e5374c |
| --- /dev/null |
| +++ b/docs/superpowers/plans/CODEX-PLAN-REGION-HA-STAGE-B-R9.md |
| @@ -0,0 +1,31 @@ |
| +Reviewed HEAD `3233d583`; the plan matches rev 5.3 at `a8744902`. |
| + |
| +**No P1/P2/P3 findings.** |
| + |
| +- **Round 8:** The live-box flag-off defect is closed. The [completion-only runtime](/home/paulca/amadan.net/carlos/platform/.claude/worktrees/region-ha-1b-next-build/docs/superpowers/plans/2026-10-10-region-ha-1b-next-stage-b.md:14366) retains discharge, hold release, owned-fence lift and marking. The failed-mark restart regression covers the reported case. |
| +- **Ruling 83:** Acceptable. [Opening the assembly earlier](/home/paulca/amadan.net/carlos/platform/.claude/worktrees/region-ha-1b-next-build/docs/superpowers/plans/2026-10-10-region-ha-1b-next-stage-b.md:14686) uses the factory’s existing constructor and preserves claim-mode gating. |
| +- **Ruling 84:** Acceptable as a deferred, claim-owned recovery dependency for this build. It does **not** provide an operational recovery route: termination still needs a failover start, and console loss declaration remains refused in claim mode. The [residual records this limitation](/home/paulca/amadan.net/carlos/platform/.claude/worktrees/region-ha-1b-next-build/docs/superpowers/plans/2026-10-10-region-ha-1b-next-stage-b.md:14841). |
| + |
| +**Verdict: ready to build, with the existing activation gates retained.** |
| + |
| +Static review only; no tests executed or files changed. |
| + |
| +--- |
| + |
| +**FIRST PROMPT:** |
| +“Follow the review brief docs/superpowers/plans/CODEX-PLAN-REGION-HA-STAGE-B-BRIEF-9.md. Review the plan at its branch HEAD (plan rev 5.3 at a8744902).” |
| + |
| +**WHAT:** |
| +Confirm the round 8 fix and assess rulings 83 and 84. |
| + |
| +**STATUS:** |
| +Review complete; no new findings. |
| + |
| +**NEEDED:** |
| +Nothing. |
| + |
| +**RECOMMENDED:** |
| +Build the plan; retain its activation gates and loss-resolution dependency. |
| + |
| +**SESSION:** |
| +Safe to close. No processes started. Read-only permissions prevented saving the handoff file. |
| \ No newline at end of file |