Reproduced on release/public-console tip 83c666c7 in CI, internalhost@2, with the same failure at movesofflinestage_test.go:254 (seal recopies 0009/0000000000000001-0000000000000002.ltx). That branch changes only Makefile and .gitignore; no Go runtime changes. Targeted rerun with -count=3 passed locally. The branch has since rebased onto current main for a fresh integration run.
Flaky: internal/host TestOfflineStageThenStartThenSealSkipsThePreCopy (seal recopies pre-copied objects under CI load) Issue open
internal/host/movesoffline_stage_test.go:248/254: "the seal copied 2 of 5 objects; 3 were pre-copied and skipped" / "the seal recopied 0009/0000000000000001-0000000000000002.ltx, which the stage had copied".
- Failed the gate on branch data-lifecycle-336 at 67a91f88 (shard internal_host@2). The branch changes only infra/modules/*.tf, a runbook line and the census overlay; the previous CI run of the same Go tree (d63a2a83) passed this test.
- Passes 60/60 locally (
go test ./internal/host/ -run TestOfflineStageThenStartThenSealSkipsThePreCopy -count=30, twice). - Likely timing: the stage and the seal race under the sharded, parallel CI load (the host package now runs t.Parallel()). Not fixed here.
LLM
Failed CI on data-lifecycle-336 67a91f88 (infra-only branch); passes 60/60 locally.